Oasis Photo gallery
before-And-
afters
A picture really is worth a thousand words! I can write about our services all day and it won't come close to the impression you get when you can see actual tangible results. Just have a look!
Arranged by service
Cleaning service (No water-change was required)
before
After
The pictures above are photos of MY pool. I intentionally let it get all nasty and green to prove a point. With properly balanced water, a sufficient level of sanitizer, vacuum, brush, skim, and a couple of backwash cycles later, you can fix most dirty pools in less than 48 hours. It's all about technique!
Acid and chlorine washes
Before..
After
Our standard acid or chlorine wash service consists of draining the old water, pressure washing the surface to remove any dirt or grime, acid or chlorine washing, and refilling and adding all the start up chemicals to the pool. The above project took about 72 hours from start to finish.
equipment installations
Before
after
The above overhaul project took about 2 days. Everything from the concrete pad up was replaced to include the motor and pump, the filter, the automatic timer clock, all of the wiring, all of the above ground plumbing, all of the valves, and a salt chlorinator and power center (for the chlorinator) was installed.
Tile Cleaning & Calcium removal
before
after
The calcium deposits pictured above are a result of high calcium hardness and was removed relatively easily by pressure washing and applying a chemical treatment. Mineral build up from a scaling condition caused by unbalanced water (the scaling side of the saturation index) can be much more difficult to remove and may require us to have a glass-bead tile cleaning contractor to get involved (which can be really expensive). Problems like this can be easily avoided by keeping a close eye on the water balance (yes, we do that too).
More to come soon!
|